Menu

Logistics

Loading routes:

  • Direct, simultaneous loading and unloading of 2 lorries at the end stage position
  • 2 additional lorries can be loaded/unloaded at the openings to the sides
  • Enclosed operations yard in the backstage area for up to 12 lorries or buses
  • Loading access right up to the stage, clearance 4.20 m

Back to event service equipment