Menu

Roof Construction / Rigging

  • Walkable rigging system above the entire hall floor area
  • Motorised chain hoist for lifting technical equipment into the ceiling area
  • 24 rigging systems, navigable at working height (each 6 m x 6 m, BGV-C1, working load each 1.1 t)
  • 71 suspension points, 10 KN to 24 KN

Back to Overview